Construction Steel Scaffolding System Types of Cuplock Scaffolding Accessories for Sale

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Information
Model NO.
HY
Material
Steel
Type
Fixed
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Surface Treatment
Galvanized/Hot DIP Galvanized/Painted
Steel Grade
Q355 / Q235
Certificate
SGS/ISO
MOQ
1PCS
OEM
Available/Customized
Application
Building/Tunnel/Bridge Construction
Advantage
Heavy Loads, Stable, Flexible, Easy Assembling
Transport Package
by Bundle or by Pallet
Specification
48.3mm
Origin
China
HS Code
7308400000
Production Capacity
50000tons /Year
Product Introduction

Cup Lock scaffolding is one of the important scaffolding systems in the world. As a modular scaffolding system, it can be used in different projects as external or internal support. Its advantages like Heavy Loads, Stable, Flexible, Easy Assembling make it widely used at home and abroad.

1) Cup Lock Scaffolding Vertical/Standard

NAME LENGTH(M) NORMAL SIZE(MM) SURFACE TREATMENT STEEL GRADE
Vertical/StandardL=0.5 - 3.0OD48.3, THK 2.5-4.0Hot Dip Galv./ Electro-Galv./Power coated/PaintedQ235/Q355

2) Cup Lock Scaffolding Horizontal Ledger

NAME LENGTH(M) SIZE(MM) SURFACE TREATMENT CUSTOMIZED
Horizontal/LedgerL=0.6 - 2.4OD48.3, THK 2.0-4.0Hot Dip Galv./ Electro-Galv./Power coated/PaintedYes

3) Cup Lock Diagonal Bracing

NAME LENGTH(M) SIZE(MM) SURFACE TREATMENT CUSTOMIZED
Diagonal BraceL=0.9*1.5 - 2.4*2.0OD33/42/48.3, THK1.8-4.0Hot Dip Galv./ Electro-Galv./Power coated/PaintedYes

4) Adjustable Base Jack

NAME LENGTH(MM) SIZE(MM) SURFACE TREATMENT CUSTOMIZED
Base JackL=450 - 100038*5, 150*150*5Hot Dip Galv./ Electro-Galv./Power coated/PaintedYes
U-Head JackL=450 - 100038*5, 150*150*50*50Hot Dip Galv./ Electro-Galv./Power coated/PaintedYes
Production Process
1. Pipe Cutting

We use auto-machine cutting blades to keep all lengths controlled within 1mm, ensuring pipe ends are plain without splinters.

2. Welding

Professional workers with more than 5 years of welding experience ensure high-quality, durable joints.

3. Sanding

Crucial process: before surface treatment, we sand welding points to ensure a beautiful finish and prevent fake welding.

4. Surface Treatment

Options include Hot dip galvanized, electro-galvanized, powder coated, and painted finishes meeting international coating requirements.

Product Display & Packaging
Related Scaffolding Materials
Frequently Asked Questions
Q1: Where is the loading port?
A: The loading port is usually the local port in North China (Xin Port).
Q2: What's the MOQ of the product?
A: Different items have different MOQs, which can be negotiated based on your requirements.
Q3: What certificates do you have?
A: We hold ISO 9001, SGS, and other relevant quality certifications.
Q4: Can I get some samples?
A: Yes, samples are free of charge, though the shipping cost is to be covered by the requester.
Q5: How long is the production cycle after ordering?
A: Generally, the production cycle takes around 20-30 days depending on the order volume.
Q6: What are the payment methods?
A: We accept T/T or 100% irrevocable LC at sight, which can also be negotiated.

Related Products