Heavy-Duty Nylon Industrial Belt Conveyor with Adjustable Speed for Mining Ore Handling

Customization: Available
Material: Stainless, PU,Rubber,HDPE,EPDM,NBR
Surface Treatment: Hot DIP Galvanized,Hot Vulcanization,Paint

Product Description

📋
Basic Information
Model NO.
DMC-BELT-0005
Motor Type
Frequency Control Motor
Installation
Horizontal
Size
Customer-Made
Od
38, 48, 50, 60, 76, 80, 89, 102, 108, 114
Treatment
Electro Plating, Galvanization
Application
Conveyer Line
Package
Wooden Crate
Specification
ISO9001
Trademark
DMC
Origin
China
Production Capacity
1,000,000 PCS/Year
⚙️
Product Description

Telescopic Belt Conveyor

  • Equipment type: fixed, movable
  • Equipment function: easy loading and unloading
  • Suitable for: 6.8m, 9.6m, 20/40ft container, 13m, 17.5m trucks
  • Loading and unloading efficiency: 1000-2000 products/hour
Selection Parameters of Fixed Telescopic Belt Conveyor
Model Sections Total length C(mm) Fixed length A(mm) Extension length B(mm) Height(mm) Belt width (mm) Optional functions
A3-6+8 3 Sections 14000 6000 8000 800 600/800/1000/1200 · Hydraulic lifting
· Standing platform
· Drop snoot
· Swing arm
· Counter
· Anti-dropping
· Wireless remote
· On-line control
· Air-conditioning device
A3-7+9.5 16500 7000 9500 800 600/800/1000/1200
A4-5+10 4 Sections 15000 5000 10000 900 600/800/1000/1200
A4-6+12 18000 6000 12000 900 600/800/1000/1200
A4-7+14 21000 7000 14000 900 600/800/1000/1200
A4-8+16 24000 8000 16000 900 600/800/1000/1200
Movable Type Telescopic Belt Conveyor Selection
High Chassis Type (Without Loading Dock)
📸
Detailed Photos
📦
Packaging & Shipping
🏭
Workshop & Factory
📜
Certifications
Frequently Asked Questions
Can we get free samples?
Yes, samples are free for our customers, but the freight for express is on the buyer's account.
How long does it take to get a sample?
After freight payment and file confirmation, samples are ready in 3-7 days and typically arrive via express in 3-5 days.
What is the normal lead time for production?
Inventory products ship within 7-10 work days. Mass production takes 25-28 days, and OEM products take 30-35 work days after deposit.
What are your payment terms?
We require T/T 30% advanced before production and the 70% balance payment before delivery.
What are the available shipping ways?
We offer shipping by sea, by air, or by express delivery based on your specific requirements.
How is the quality control managed?
Our professional QC team monitors quality throughout the production process and performs rigorous tests before shipment.

Related Products